|
Saturday April 26 |
||
|
|
|
Basics of PMT calibration ROOM MAITEN (BLUE) · Principle of PMT and its calibration (1hour) · Absolute Calibration of PMT by NIST standard
(30min) · Imperfect behavior of PMT (1hour) |
|
|
|
Visit to PMT test/potting
facility at SDE-Fabrica (Shuttle bus
leaves the Conference center at |
|
|
|
SD and FD PMT Calibration ROOM
CANELO (RED) · Principle of detector system calibration
(20min) · SD PMT Specs (20min) · SD PMT test facility and test results(30min,
Barnhill) · FD PMT Specs and calibration (20min) · FD Photon yield studies and systematic
errors (30min) |
|
Sunday April 27 SD Calibration & SD/FD Cross Calibration
Workshop |
||
|
|
|
SD Calibration Workshop ( ROOM MAITEN (BLUE) · Local Station Calibration and Monitoring
Update ( · Studies of Pedestal Induced Systematics and Electronics
Noise: (Gonzalo) · Report from · LED Flasher Measurements in Orsay Tank, and
Result of biological analysis of EA Tanks ( · Water Level Monitoring Studies (Clementina) · Results of the muon data Analysis (Arun, 30
min) · The Offline Calibration Database ( · Strategy to Minimize SD Systematics ( · Discussion (All) |
|
|
|
FD/SD Energy Cross Calibration ( ROOM MAITEN (BLUE) · Absolute energy by Ground Array:
AGASA/Auger-SD (30min) · Absolute energy by FD: HiRes/Auger-FD
(30min) · Auger FD calibration (40min, J.Brack/M.Roberts) · How to minimize systematic error in FD
(30min) · Strategy for SD/FD energy cross calibration
(30min) · Discussion (All, 30min) |
More
information will be posted at
http://www.physics.ucla.edu/~arisaka/auger/pmt_school/