Pierre Auger Collaboration Meeting

Malargüe

November 11 - 15, 2002

 

 

Registration Opens Sunday evening, November 10, at Convention Center

 

Payment must be in pesos, please

 

Registration $30

Celebration Lunch $35

Auger shirt $20

Auger lapel pin $5

 

 

 

Contributions to the City’s

“Fund for the Restoration of Malargüe’s Historic Buildings” can be made at the Registration desk


 

 

Monday November 11

Plenary Session ROOM CANELO (RED)

09:00

10:30

Advisory Group Meeting, Office Building Meeting Room.

10:30

11:00

Break

11:00

11:30

Welcome & Status of the Observatory 

A. Watson, H. Blüemer

11:30

11:45

Management report

Paul Mantsch

11:45

14:00

Lunch

14:00

16:30

Task groups discussions

 

 

SDE Workshop, Tiina Suomijarvi organizer

ROOM CALDEN (YELLOW & BLACK)

Status, Schedule and QA of different SDE sub-tasks.

 

 

FD and FDE Workshop, J. Kleinfeller, P. Privitera, D. Camin, M. Kleifeges organizers    

VISITOR’S CENTER OFFICE BUILDING
1)AB production and pre-integration test, Michela Chiosso (10’)
2) Corrector Ring final test: pictures of Vega. Determination of the spot size with the german and brazilian rings.  Vitor de Souza (15’)
3) Star tracking for absolute telescope pointing. Viviana Scherini (15’)
4) Drum Calibration. Jeff Brack (15’)
5) Piece to piece calibration. J. Matthews (10’)
6) First test for fluorescence yield measurement at Campinas. Ernesto Kemp (15’)

 

 

SD Workshop, I. Allekotte & P. Mazur org.  

ROOM CANELO (RED)

Specifications for resins and tanks……………………………………………xx’

Cabling and accessories……………………………………………………………………………xx’
Liner manufacturing………………………………………………………………………………………xx’

Assembly issues…………………………………………………………………………………………………xx’

Water plant……………………………………………………………………………………………………………xx’

16:30

17:00

Break

17:00

19:00

Task groups discussions

 

 

Open

 

 

Atmospheric Monitoring Results I, John Matthews org.

ROOM CALDEN (YELLOW & BLACK)
1. Horizontal attenuation monitor and weather stations (Brian Fick) 15min = 10min talk + 5min discussion)
2. Aerosol phase function monitor (John Matthews) 15m
3. Cloud monitors (Adelaide) 15m
4. Star Monitor (Paul Sommers) 10m
5. Radiosondes (Hans Klages) 10m
6. Los Leones and Coihueco LIDAR  
           - Laser system (Mike Roberts)   5m
           - Steering mechanism and cover  (Torino) 10m
           - DAQ systems (Slovenia)   10m
           - Software/Remote control (Torino/Slovenia) 10m
7. VAOD measurements with the LIDARs (Mike Roberts/Miguel Mostafa) 10m

 

 

SD-SDE-COMMUNICATIONS Integration, Ingo Allekotee, Tiina Suomijarvi and Paul Clark organizers     

ROOM CANELO (RED)

19:00

20:00

Publication Committee Meeting, Danilo Zavrtanik organizer

Exact time depends on D.Z.’s arrival to Malargüe.

MEETING ROOM, OFFICE BUILDING


 

Tuesday November 12

Plenary Session ROOM CANELO (RED)

09:00

09:45

Collaboration Board Meeting I, T. Dova & P. Sommers

Issues for discussion

09:45

10:30

Analysis: the next stages, Alan Watson and Paolo Privitera organizers

10:30

11:00

Break

11:00

12:30

Analysis: the next stages, continuation.
1)FD Calibration and Atmosphere: summary of Chicago Wkshop. B. Fick (15’)
2)FD Shower Reconstruction: summary of Chicago Wkshop. P. Sommers (15’)
3)Analysis of EA FD data set. Valerio Verzi (10’)
4)Horizontal FD Showers. Pedro Facal (10’)
5)Hybrid reconstruction. Vitor de Souza (10’)

12:30

14:30

Lunch

14:30

15:30

Analysis: the next stages, continuation.

Pierre Billoir

Toko Yamamoto

Maximo Ave (or Enrique Zas).

15:30

16:00

Break

16:00

19:30

Parallel sessions

16:00

18:30

Quality Management Review: SDE, organizer T. Suomijarvi

ROOM MAITEN (BLUE)

General Statement on Task Quality Results and Objectives

Paul Mantsch 10’

Project Quality Management

J. Blowers 20’

 

Discussion on the system development and audit plan 30’

Task Quality Correspondent

Yves Ades 15’

Task Leaders

Jim Beatty and Tiina Suomijarvi 15’

 

Discussion on the SDE improvements objectives 30’

Task Leaders Conclusions 30’

 

16:00

18:00

FD Analysis Tasks, P. Privitera organizer

ROOM CALDEN (YELLOW & BLACK)
Tasks implementation (30 min)
1) Trigger Studies. S. Petrera (15 min)
2) Shower reconstruction. F. Guarino (10 min)
3) Shower geometry. P. Sommers (10 min)
4) On the electromagnetic energy estimation in FD. V. Verzi (15’)
5) Fluorescence yield treatment in reconstruction. B. Dawson (10 min)
6) Studies on energy deposits in EAS. Markus Risse (15 min)
7) Hybrid simulation. Vitor de Souza (15 min)
8) FD Simulation as Analysis tool. Luis Prado (10 min)

18:00

19:30

FD Online software, H.-J. Mathes organizer

ROOM CALDEN (YELLOW & BLACK)

20:30

22:00

Clase Pública: Estado del Observatorio Pierre Auger

SALA CANELO (RED)

 

 


 

Wednesday November 13

Plenary Session

08:30

11:00

Advisory Group Meeting, Office Building.

09:00

10:45

EA calibration/monitoring by EA Data, Organizer: K. Arisaka  

ROOM CANELO (RED)

5min Katsushi Arisaka Introduction

10min Xavier Bertou EA calibration, status and prospects

10min Clementina Medina Muon Data analysis – EA

10min Tohru Ohnuki Calibration by Raw Muon data

10min Arisaka (for Arun) Low gain vs High Gain (TBA)

[Conversion from "Muon hump" to "VEM"]

10min Tom Paul/Mccauley GEANT4 at Northeastern

10min Stephane Ranchon GEANT4/SDSim/Laura at LAL

10min Sylvie/Isabelle SDSim at IPNO

10min Alberto Etchegoyen Study at Tandar (TBA)

10min Arisaka (for Slater) GEANT3 at UCLA

10min Discussion

10:45

12:30

Collaboration Board Meeting II, T. Dova & P. Sommers

ROOM CANELO (RED)

Draft agenda:

1. Financial matters
- Construction plan: Cost estimate and budget
- Construction funding; common fund and operating fund
- Report from Country Representatives about the expected future funding

2. Memberships
- Presentation of new groups.

  - Approval of Institutions with signed Memoranda of Understanding
- Mailing lists

3. Project management issues
- New task leaders

4. Report from Conference Committee

5. Publication Committee
- Report of papers handled
- Publication policy

6. ICETOP's request to use Auger tank simulation code

7. Report on European Union activities in which Auger takes part

8. Organization of shifts for observatory operation

9. Organization for next ICRC (Japan)

10. Next meeting
Suggested date: week of April 28

11. A.O.B

 

12:30

14:30

Lunch

Plenary Session ROOM CANELO (RED)

Chairman: Alan Watson

14:30

15:30

FD (including buildings), Status & Schedule, J. Kleinfeller & P. Privitera organizers

 

15:30

16:30

FDE, Status & Schedule, M. Kleifges & D. Camin organizers

 

16:30

17:00

Break

17:00

17:30

COMMS, Status and Schedule, P. Clark organizer

 

17:30

18:30

SD (Including Surveying), Status & Schedule, I. Allekotte & Peter Mazur, organizers

 

18:30

19:30

SDE, Status & Schedule, J. Beatty & T. Suomijarvi, organizers

 

20:30

22:00

Public Lecture in English: Status of the Pierre Auger Observatory

ROOM CANELO (RED)


 

Thursday November 14

Plenary Session ROOM CANELO (RED)

Chairman: Giorgio Matthiae

09:30

10:30

Education, Public Relations and Visitor Center, Status & Schedule, Beatriz Garcia and Greg Snow organizers

10:30

10:45

Address by the CNEA’s President, Professor J. Abriata to the International Collaboration.

Presented by Dr. A. Etchegoyen

10:45

11:15

Break

11:15

12:15

Open

12:15

14:00

Lunch

14:00

15:00

Physics Session I or Analysis Task organization discussion, org.

15:00

15:30

Break

15:30

17:30

Task groups discussions

 

 

SD-SDE PMT Testing and assembling, I. Allekotte and K. Arisaka organizers   

ROOM MAITEN (BLUE)

DPA discussion    

VISITOR’S CENTER, OFFICE BUILDING

1. S. Argiro', Software Development, 15 min
2. A. Cordier, Data Management, 20 min
3. S. Sciutto, Internet       15 min
4. S. Dagoret, SDSim developments    20 min
5. S. Dagoret, CMT/CVS experience    10 min
6. V. de Souza, Hybrid Simulation     20 min
7. O. Pisanti, Neutrino Simulation   20 min

OPEN   

ROOM NORTE DIRECCIÓN DE TURISMO

17:30

18:30

Data bases for non-event data   

VISITOR’S CENTER, OFFICE BUILDING
What to store?
  * Detector description (e.g. coordinates)
  * Calibration
  * Monitoring
  * Atmosphere
  * Weather
Who provides (and enters) the data?
  * Identify sub-systems and responsible (sub-) tasks
How is the data available for off-line work?
  * Transfer of data
  * Access within off-line software and other means

 

18:30

19:30

FD-CDAS working group meeting, H-J Mathes, A. Letessier-Selvon organizers
ROOM MAITEN (BLUE)

18:30

19:30

SD assembly, deployment and readiness review

C. Hojvat, chairman  

ROOM NORTE DIRECCIÓN DE TURISMO

20:30

22:00

Clase Pública: Estado del Observatorio Pierre Auger

SALA CANELO (RED)

 


 

Friday November 15

 

09:00

11:00

Technical Board Meeting, Office Building

09:00

10:45

Informal Discussion on Calibration and Monitoring, Katsushi Arisaka organizer
ROOM CANELO (RED)
Systematic errors of using "VEM"

Calibration constant data base
What parameters should be recorded
How often do we update?
Data structure
Who maintains?

More data taking for better calibration
Comparison of "Muon hump",
"VEM", and "Inclined Muons".
LED data taking
 
Organization of subgroups
Group1: Campinas/Orsay/Puedla/Torino
Group2: Baril/Tandar/CSU/Northeastern/UCLA
Group3: LAL/Cd\F/Rio de Janeiro

10:30

11:00

Break

11:00

13:00

Task groups discussions

 

 

Atmospheric Monitoring Results II, John Matthews organizer

ROOM MAITEN (BLUE)
1. Los Leones LIDAR data analysis (Torino,Slovenia,UNM)         20m + 10m (and comments about any hardware changes needed)
2. Los Leones LIDAR test/commisioning schedule. (UNM) 20m + 10m
3. Implementation of atmospheric data base and atmospheric      20m + 10m corrections in the MC and analysis programs. (Mike Roberts, Chihwa Song)

SDE Workshop, Continuation, Tiina Suomijarvi organizer 

ROOM CANELO (RED)

Status, Schedule and QA of different SDE sub-tasks.

 

OPEN  

ROOM SUR DIRECCIÓN DE TURISMO

13:00

 

Pierre Auger Detector Celebration

Castillos de Pincheira

Transportation provided

 

14:00 Welcome with empanadas and wine

      Horse riding

      Trekking to Castillo across de Malargüe River

15:30 Parrillada y asado

      Entertainment with Argentine música folclórica